3 routing cables, Routing cables, Connecting and disconnecting cables – FUJITSU Primecenter M1 BS2000 User Manual

Page 58: Figure 27: pdu bracket with cable tie

Advertising
background image

58

Connecting and Disconnecting Cables

©

c

o

g

n

it

as

. Ges

e

lls

c

h

ft

f

ü

r T

e

c

hni

k

-D

o

k

u

m

e

n

tat

ion m

b

H 20

11

P

fa

d

:

O

:\

F

T

S

\P

RI

M

E

R

G

Y

-HW

\R

a

c

k

\P

C

R

-M

1

-R

ac

k

\M

anua

ls

\U

s

e

r M

anu

al

\0

2

_

wo

rk

\pc

r-

m

1

-r

ac

k

-u

m

-en

\pc

rm

1-

rac

k

-u

m

-e

n

.k

0

6

6.3

Routing Cables

This section contains several examples of how to route cables in the
PRIMECENTER M1 19-inch rack.

Introduction

Only internal cables are routed at the factory before delivery. All other cables
must be routed during rack installation at customer site.

If one or more lateral cable managements are mounted with an installed device,
all external cables must be routed in these guides. If the installed lateral cable
managements are not sufficient for the number of cables, you must install
additional ones.

The lateral cable managements must be installed 1 HU apart. If this is not
possible, the cables must be routed in the rack before installing the device.

For easier access to the lateral cable managements you can pull out the
systems above and below the guides toward the front.

Using cable ties

Figure 27: PDU bracket with cable tie

Ê

Thread a cable tie through the two openings (see circles in figure above) in
the PDU bracket

Ê

Mount the PDU brackets into the groove of the rear pillars using two spring
nuts M5 and two screws M5x10 mm.

Advertising