Power distribution, Installation is possible on both sides – FUJITSU Primecenter M1 BS2000 User Manual

Page 96

Advertising
background image

96

Power Distribution

©

c

o

g

n

it

as

. Ges

e

lls

c

h

ft

f

ü

r T

e

c

hni

k

-D

o

k

u

m

e

n

tat

ion m

b

H 20

11

P

fa

d

:

O

:\

F

T

S

\P

RI

M

E

R

G

Y

-HW

\R

a

c

k

\P

C

R

-M

1

-R

ac

k

\M

anua

ls

\U

s

e

r M

anu

al

\0

2

_

wo

rk

\pc

r-

m

1

-r

ac

k

-u

m

-en

\pc

rm

1-

rac

k

-u

m

-e

n

.k

0

7

7.3.6.2

Installation options for 700 mm wide symmetrical racks

Performing the task

Ê

Install the PDU brackets as described on

page 69

.

Figure 64: Single-phase 10-way socket strip mounted in a 700 mm wide symmetrical rack

Ê

Screw each socket strip with 2 screws onto the PDU brackets.

I

Installation is possible on both sides.

Rack height

Installation direction vertically

Installation direction horizontally

42 HU

2x

ok

24 HU

ok

ok

Table 17: Installation options for 700 mm wide symmetrical racks

Advertising