Venting installation, Optional gas line installation – FMI (V)G42H/50H User Manual

Page 11

Advertising
background image

www.fmiproducts.com

109493-01R

11

VenTing insTallaTion

Continued

FINISHING FIREPLACE

Combustible materials, such as wallboard,

gypsum board, sheet rock, drywall, plywood,

etc. may make direct contact with sides and

top around the fireplace face. It is important

that combustible materials do not overlap the

face itself. Brick, glass, tile or other noncom-

bustible materials may overlap the front face

provided they do not obstruct essential open-

ings like louvered slots or any other opening.

When overlapping with a noncombustible

facing material, use only noncombustible

mortar or adhesive.

10'

2' Min.

10'

3' Min.

2' Min.

3' Min.

Level of

Flue Gas

Outlet

Figure 17 - 10 Foot Rule

Figure 18 - Gas Line Knockout

Side

Firebrick

Finished

Side

Refractory

Knockout

Plug

Outside of

Fireplace

Gas Line

Conduit
Insulation

Gas

Conduit

Cover

1/2" Dowel

Remove

Knockout

10 FOOT RULE

All flue gas outlet chimney terminations must

extend a minimum of 3 feet in height above the

highest point where it passes through the roof

and must be at least 2 feet above the high-

est point of the roof that is within a horizontal

distance of 10 feet (see Figure 17).

Gas line hook up should be done by your

supplier or a qualified service person.
Note: Before you proceed, make sure your

gas supply is turned off.
Use only a 1/2" black iron pipe and appropri-

ate fittings.

1. Remove knockout indentation on refrac-

tory or firebrick wall located above refrac-

tory hearth floor. The knockout indentation

must be firmly tapped with any solid object

such as a 1/2" dowel until it is released.

Remove fragmented portions of refractory

(see Figure 18).

2. Remove gas line cover plate located on

either side of fireplace and pull out insu-

lation from gas line conduit sleeve. Save

insulation for reuse. Replace screws.

3. Run a 1/2" black iron gas line into fire-

place through the rear at gas line conduit

sleeve (if using a raised platform, add

height). Provide sufficient gas line into

fireplace chamber for fitting connection

(see Figure 19). Note: Secure incoming

gas line to wood framing to provide rigidity

for threaded end.

4. Repack insulation around gas line and into

sleeve opening. Seal any gaps between

gas line and refractory knockout hole with

refractory cement or commercial furnace

cement, Install the gas appliance or cap

off gas line if desired.

Seal

Opening

with

Refractory

Cement

Outside of

Fireplace

Gas

Line

Conduit

Repack

Insulation

Incoming

1/2" Black

Iron Pipe

Side

Firebrick

Finished

Side

Provide Enough Threaded

End for Fitting Connection

Figure 19 - Gas Line Installation

opTional gas line insTallaTion

Advertising
This manual is related to the following products: