VenTing insTallaTion

Continued

Figure 9 - Elbow Offset

B

A

Screws

FIRESTOP SPACERS (FS-10)

Firestop spacers are required at each point

where the chimney penetrates a floor space.

Their purpose is to establish and maintain

the required clearance between the chimney

and the combustible materials. When the pipe

passes through a framed opening into a living

space above, the firestop must be placed onto

ceiling from below as shown in Figure 10.
They also provide complete separation from

one floor space to another or attic space as

required by most codes. When the double wall

pipe passes through a framed opening into an

attic space, the firestop must be placed into

an attic floor as shown in Figure 11.

Figure 10 - Firestop Spacer with Living

Space Above Ceiling

Figure 11 - Firestop Spacer with Attic

Space Above Ceiling

Existing

Ceiling

Frame

Firestop

Spacer

Screws or

Staples

(Min. of 8)

Firestop

Spacer

Screws or Staples

(Min. of 8)

PENETRATING ROOF

To maintain a 1" clearance to pipe on a roof with

a pitch, a rectangular opening must be cut.

1. Determine the center point through which

pipe will penetrate roof.

2. Determine the center point of the roof. Pitch

is the distance the roof drops over a given

span, usually 12". A 6/12 pitch means that

the roof drops 6" for each 12" one measure

horizontally down from the roof rafters.

3. Use the roof opening chart (Figure 12) to

determine the correct opening length and

flashing required.

4. Remove shingles around the opening

measured. Cut out this section.

5. Add next sections of pipe until the end

penetrates roof line. Check to see that the

proper clearances are maintained. Extend

chimney by adding sections of double

wall pipe until pipe is minimum of 30"

above the highest point of the roof cutout.

Termination and chimney must extend a

minimum of 36" above the highest point

where it passes through the roof.

19.5" Min.

30" Min.

2" Min.

2" Min.

2" Min.

Opening "A"

Pitch

Slope Opening

"A" Max.

Used Flashing

Model No.

Flat

19.5"

V6F-10DM

0-6/12

26.6°

22"

V6F-10DM

6/12- 12/12 45.0°

27"

V12F-10DM

Existing

Ceiling

Frame

Figure 12 - Roof Opening Measurements

FLASHING INSTALLATION (v6F-10DM

OR v12F-10DM)

Determine flashing to be used with the roof

opening chart. Slide flashing over pipe until

base is flat against roof. Replace as many

shingles as needed to cover exposed area

and flashing base. Secure in position by nailing

through shingles (see Figure 13, page 10). DO

NOT NAIL THROUGH FLASHING CONE.