2. INSTALLATION


2-9

2.3

Installing the Processor Unit

The processor unit should be mounted aligned with the ship’s fore-and-aft line. It
can be mounted on the deck, bulkhead, or on the underside of a desk. Choose a
mounting location which allows you to easily view the power lamp on the top of
the unit and which is within

±

2.5

°

of the ship’s fore-and-aft line.

2.3.1 Deck

mount

1. The processor unit is factory adjusted for deck mounting. Fasten the

processor unit to the mounting location with tapping screws (5 x 20, 4 pcs.).
The unit can be oriented in one of the directions shown in the figure below.
After the unit is installed, you will specify the mounting method from the
menu.

Bow

Stern

Stern

Stern

Stern

Port

Starboard

Mounting Method: "Floor"
(Deck)
Mounting Direction: A

Mounting Method: "Floor"
(Deck)
Mounting Direction: B

Mounting Method: "Floor"
(Deck)
Mounting Direction: C

Mounting Method: "Floor"
(Deck)
Mounting Direction: D

Bow

Port

Starboard

Bow

Port

Starboard

Bow

Port

Starboard

Name plate

Connectors

Reference Direction

POWER switch
(power lamp)

Processor Unit, top view

Mount processor unit
so reference
direction is within

±

2.5

°

of

fore-and-aft line.

DIRECTION "A"

DIRECTION "B"

DIRECTION "C"

DIRECTION "D"

Processor unit orientation, deck mounting

2. Fasten the ground wire between the ground terminal on the processor unit

and the ship’s hull.