5 wiring – Furuno SC-60 User Manual

Page 30

Advertising
background image

2. INSTALLATION


2-16

2.5 Wiring

This section covers general wiring. For further details see the interconnection
diagram at the back of this manual.

DISPLAY UNIT
SC-602

PROCESSOR UNIT
SC-601/SC-601-D

DGPS

ANTENNA

GR-800-1-S

*

12-24 VDC

ANTENNA UNIT
SC-303

MJ-A7SPF0006-100,
10m

TPPX6-3D2V-15M, 15m

TNC-PS-3D (15 m)

MJ-A3SPF0013-035,
3.5 m

General wiring diagram

The display cable (display and processor units) is 10 m long. Connect it to the
DISPLAY port on the processor unit.

The antenna cable is 15 meters (standard length). Connect the three coaxial
cables to the processor unit according to cable color as below. Incorrect
connection will result in wrong heading.

Antenna TPPX6-3D2V-15M

Port on

Processor Unit

Antenna Element 1 No color

GPS ANT 1

Antenna Element 2 Yellow

GPS ANT 2

Antenna Element 3 Red

GPS ANT 3

Note 1:

Instead of TPPX6-3D2V, three Japan Industrial Standard coaxial cables

3D2V (local supply) or equivalent can be used as antenna cables.

Core

B

0.96 mm

Sheath

Shield

Insulator T1.02 mm

3D2V

50

9

B

5.3 mm

Sectional view of coaxial cable 3D2V

Advertising