5 installation check list – Furuno 851 MARK-2 User Manual

Page 23

Advertising
background image

2. WIRING

2-6

1
2
3
4
5
6

Solder

Shield

FM-C6FPS001

RD_H

RD_C

SHIELD

SHIELD

TD_H
TD_C

Other Equipment
(Echosounder data not output.)

Echosounder

MODEL 851
MARK-2
OPTION connector

10mm

10mm

10mm 10mm

TD-H
TD-C

RD-H
RD-C

SHIELD

Figure 2-8

4. Cover shield with steel mesh by cable ties.

MODEL851 MARK2
OPTION connector

Cable tie

Steel mesh

Shield

Other Equipment

Echosounder

After tieing, wrap with
self-vulcanizing tape.

Figure 2-9

5. Wrap with self-vulcanizing tape.

2.5 Installation Check List

After completing the installation it is a good idea to check for proper installation.
Follow the checklist below and tick boxes to show proper completion.

!

Is the signal cable secured against a mast or bulkhead?

!

Is the cable gland or cable entry on the deck fully waterproofed?

!

Are the connections to the battery correct polarity?

!

Are all the antenna and display units grounded?

!

Are all connectors at the rear of the display unit fastened securely?

Advertising