Warning caution, Warning – Friedrich 2008 User Manual

Page 17

Advertising
background image

3. Install a process tube to sealed system.

4. Make necessary repairs to system.

5. Evacuate system to 200 microns or less.

6. Weigh in refrigerant with the property quantity of R-22

refrigerant.

7. Start unit, and verify performance.

8. Crimp the process tube and solder the end shut.

Proper safety procedures must be followed,

and proper protective clothing must be worn

when working with a torch.

Failure to follow these procedures could

result in moderate or serious injury.

Proper safety procedures must be followed,

and proper protective clothing must be worn

when working with liquid refrigerant.

Failure to follow these procedures could

result in minor to moderate injury.

WARNING

CAUTION

BURN HAZARD

FREEZE HAZARD

Proper safety procedures must be followed,

and proper protective clothing must be worn

when working with a torch.

Failure to follow these procedures could

result in moderate or serious injury.

WARNING

BURN HAZARD

Method Of Charging / Repairs

The acceptable method for charging the RAC system is the

Weighed in Charge Method. The weighed in charge method is

applicable to all units. It is the preferred method to use, as it is

the most accurate.

The weighed in method should always be used whenever

a charge is removed from a unit such as for a leak repair,

compressor replacement, or when there is no refrigerant

charge left in the unit. To charge by this method, requires the

following steps:
1. Install a piercing valve to remove refrigerant from the

sealedsystem. (Piercing valve must be removed from the

system before recharging.)

2. Recover Refrigerant in accordance with EPA regulations.

15

Advertising
This manual is related to the following products: