Installation instructions, Fitting of frames – Stovax PM219 User Manual

Page 21

Advertising
background image

21

INSTALLATION INSTRUCTIONS

2.6 Or

• Fit a Multi-fuel box, Diagram 9

This must be done with the frame removed, see Section 3

9

PR8084

2.7 Fit a Contemporary Multi-fuel Log bar, Diagram 10

Slide into channels in the front of the Multi-fuel Box and

cutout in grates.

The removable frame base is not shown for clarity but must

be in place before the Log Bar is fitted, See Section 3A.

10

PR8082

3. FITTING OF FRAMES

3.1 Brass or Brushed Steel Profil Frames

• Fit the brass or brushed steel Profil Frame, Diagram 11

11

Tab

• Locate the frame around the flange

• Fold the tabs around the back edge of the flange - shown

in detail (2 on sides and 2 on top)

3.2 Arts Frames

• Drill 4

Ø7.5 holes in the positions shown, Diagram 12

A 1:1 scale drilling template is provided with the frame to

assist in correctly locating the holes.

16" Frame Drilling Template

12

338

434

18

30

Ø7,5THRO - 4 POS

20

547

All dims to be 0.5mm

+-

• Attach Upper ('U' shaped) and Lower (L shaped) brackets

on the front of the firebox flange using M6 Countersunk

Screws and Nuts, Diagram 13

13

PR8086

M6 Nut

M6

Countersunk

Screw

• Line the frame up with the flange

• Lower the frame over the brackets and slide into bracket

slots

• Check it is located securely, Diagram 14

Advertising