COMMISSIONING

27

COMMISSIONING

1.1 To commission:

• Check the soundness of seals, castings and joints

(Convector box flange and flue gather)

• Check the operation of the air controls

1.2 Now carry out a final smoke draw test:

• First warming the flue with a blowlamp, or similar, for

about 10 minutes

• Place a smoke pellet on the centre of the firebox, with

the air controls open

Smoke should now be drawn up the flue and be seen to

exit from the flue terminal.

• Complete test with all doors and windows closed in the

room where the appliance is fitted

• If there are any extractor fans in adjacent rooms, the test

must be repeated with the fans running on maximum and

interconnecting doors open

• Check the effect of ceiling fans during the test

If the test fails, re-check the suitability of the flue system

and ventilation. An inadequate air supply to the room is

potentially dangerous.

• Light the appliance and slowly increase the temperature

to operating levels

• Ensure no combustion products enter the room

• When the appliance reaches operating condition carry

out a spillage test with a smoke match or pellet around the

opening

1.3 If excessive spillage occurs:

• Allow the appliance to cool and re-check the flue system

and ventilation

1.7 Finally:

Explain the safe operation of the appliance and the use

of the controls to the user and the importance of only

using suitable fuels

• Explain the cleaning and routine maintenance

requirements

Explain the requirement to use a suitable fireguard

when children, elderly or infirm persons are near the

appliance

Record dealer/supplier details and installer details in

Instructions

Record serial number in page 3 of Instructions

This number is required when ordering spare parts and

making warranty claims

Give the copy of the Instructions to the customer