Installation instructions – Stovax PM219 User Manual

Page 22

Advertising
background image

22

INSTALLATION INSTRUCTIONS

14

PR8087

3.3 Steel Square/Rectangular Frames

• Drill 4

Ø7.5 holes in required positions, 16" Diagram 12,

22" Diagram 15, 26" Diagram 16

A 1:1 scale drilling template is provided with the frame to

assist in correctly locating the holes.

22" Frame Drilling Template

15

464

584

30

30

Ø7,5THRO - 4 POS

20

607

All dims to be 0.5mm

+-

26" Frame Drilling Template

16

564

684

30

30

Ø7,5THRO - 4 POS

20

607

All dims to be 0.5mm

+-

• Attach upper and lower brackets on the front of the

firebox flange using M6 Countersunk Screw and Nuts,

Diagram 17

17

PR80088

Upper Bracket

Return

Top Flange

The top brackets have a return that sits on the top flange,

see detail views. The bottom brackets must line up

horizontally with the upper.

• Slide the air deflector in a right direction, behind the

Upper Frame brackets, See Diagram 18

Frame not shown for clarity

18

PR8092 - 2

PR8092 - 1

• Line the frame up above the brackets and lower into

bracket slots locating the top first

19

PR8089

Front

Back

• Check the frame is located securely with all 4 frame

brackets in the bracket slots

Advertising