PAGE 26 — MAYCO ST-45HRM CE PUMP — OPERATION & PARTS MANUAL — REV. #0 (02/23/04)

ST-45HRM CE CONCRETE PUMP— OPERATING PROCEDURES

WARNING

DO NOT open any of the
delivery system joint clamps.

Saftey glasses MUST be worn at all times
when operating the ST-45. Failure to fol-
low saftey guidlines can result in serious
injury.

“Reverse” Pumping Procedure

A. Switch the pump into

reverse

. With pump speed at a

medium-slow (approx. 12 strokes per min.) try to pull
the “pack” back into the hopper with 5 or 6 reverse
strokes
.

B. Remix the concrete in the hopper.

C. Switch the pump into

forward

. If it is still plugged, repeat

“Reversing” procedure three times.

If concrete still does not move, proceed to the Shuttle Tube
Inspection Procedure.

Shuttle Tube Inspection Procedure

A. Stop the pump. Switch off the engine.

B

The senior or most experienced operator must warn all
others to stand at least 6.1 meters (20 feet) away from
the machine and turn their heads to face away from the
pump.

C. The operator will position themself beside the reducing

elbow at the pump outlet. Wearing

safety glasses

,

slip the end of a pry bar (61 cm/24" length of reinforcing
steel rod) under the latch of the hose clamp and flip it
up.

C. Mix the prime to the consistency of a smooth batter.

D. Position the first ready-mix truck at the hopper. Check

the concrete. DO NOT discharge concrete into hopper
at this time.

NOTE

E. Pour approximately two 18.9 liter (5 gallon) buckets of

prime into the first hose and connect it to the pump.

F.

With the pump in FORWARD at 25-30 strokes per
minute, slowly discharge the concrete from the ready-
mix truck into the hopper and completely fill it. Keep the
pump running continuously until concrete is discharging
at the end of the delivery system. If the pump is stopped
during this procedure, a blockage may occur.

G. If it is necessary to replace or add a section of delivery

system, after the initial lubrication procedure, wet the inside
area of the hose, pipe or elbow with 18.9 liters (5 gallons)
of water per 7.62 meters (25 ft.) length, before adding it to
the system.

The bentonite is not compatible with
concrete. DO NOT pump it into the
forms. Discharge it out of the formed
area.

Use extreme care! The hose line is under

pressure

and can cause serious injury.

Clearing Concrete Blockage

13. Damaged hoses with internal restrictions can cause block-

ages.

14. If a blockage occurs in a hose,

walk the hose

until you find

the point of trouble. The hose will be soft immediately past the
blockage. If this happens at the start, disconnect the hose at
the first coupling past the blockage.

15. Elevate the hose at that point with the blockage area hanging

down. Using a hammer, you can pound the down-stream
edge of the packed area until it is free to flow. Shake all of the
sand and gravel out to the end of the hose. Before reconnect-
ing the hose, start the pump and run a small amount of
concrete out to the end of the hose. This will assure that all
of the separation is out of the hose.

16. The shuttle tube is plugged if volume at the discharge end of

the hose stops, the hose is soft and the hydraulic oil pressure
gauge reads 20.7 mPa (3000) psi or more.

To clear a plug in the shuttle tube, great care must be taken
as a dangerous condition will exist from pressure build-up
inside the shuttle tube. (With the shuttle valve, the concrete
can be pumped in reverse.) Use the following prodedures
to clear the shuttle tubes.

CAUTION

CAUTION