8. sequence of shielded metal arc welding (smaw), 9. sequence of gas tungsten arc welding (gtaw), 1. routine maintenance – Miller Electric MOG-350 User Manual

Page 24: 3 months, 6 months

Advertising
background image

OM-808 Page 20

4-8.

Sequence Of Shielded Metal Arc Welding (SMAW)

Begin Welding

ssb7.1 9/92

Install &

Connect

Equipment

Select

Electrode

Put On

Personal Safety

Equipment

Set Controls

Insert

Electrode

Into Holder

Turn On

Welding Power

Source

4-9.

Sequence Of Gas Tungsten Arc Welding (GTAW)

Turn On

Shielding Gas

ssb8.1* 12/92

Install &

Connect

Equipment

If Applicable,

Install High_

Frequency Unit

Select

Tungsten

Insert

Tungsten

Into Torch

Put On

Personal Safety

Equipment

Set Controls

If Applicable,

Turn On High-

Frequency Unit

Turn On

Welding Power

Source

Begin Welding

SECTION 5 – MAINTENANCE & TROUBLESHOOTING

5-1.

Routine Maintenance

Ref. ST-124 643-A

3 Months

Turn Off all power before maintaining.

Tape Or

Replace
Cracked

Cables

Replace

Unreadable

Labels

Clean

And

Tighten Weld

Connections

6 Months

OR

During Heavy Service,

Clean Monthly

Blow Out

Or

Vacuum

Inside

Advertising
This manual is related to the following products: