5 validate the plan – IBM J.D. EDWARDS' ONEWORLD B73.3 User Manual

Page 234

Advertising
background image

222

J.D. Edwards’ OneWorld B73.3 and Windows Terminal Server

Figure 174. Work with Installation Plans Screen

54.Click OK to continue.

8.3.5 Validate the Plan

In this section, you will run the plan validation report to ensure that the plan is
correct and ready for installation.

1. Run the plan validation report. If you are not at the System Installation Tools

menu, type

GH961

in the Fast Path field and press Enter.

2. Double-click Plan Validation. You will see a screen similar to Figure 175 on

page 223.

Advertising