IBM Z10 BUISNESS CLASS Z10 BC User Manual

Page 44

Advertising
background image

z/OS Capacity provisioning allows you to set up rules

defi ning the circumstances under which additional capac-

ity should be provisioned in order to fulfi ll a specifi c busi-

ness need. The rules are based on criteria, such as: a

specifi c application, the maximum additional capacity that

should be activated, time and workload conditions. This

support provides a fast response to capacity changes and

ensures suffi cient processing power will be available with

the least possible delay even if workloads fl uctuate.

An installed On/Off CoD record is a necessary prerequisite

for automated control of temporary capacity through z/OS

Capacity Provisioning.

See z/OS MVS Capacity Provisioning User’s Guide (SA33-

8299) for more information.

On/Off CoD Test: On/Off CoD allows for a no-charge test.

No IBM charges are assessed for the test, including IBM

charges associated with temporary hardware capacity,

IBM software, or IBM maintenance. This test can be used

to validate the processes to download, stage, install, acti-

vate, and deactivate On/Off CoD capacity non-disruptively.

Each On/Off CoD-enabled server is entitled to only one no-

charge test. This test may last up to a maximum duration

of 24 hours commencing upon the activation of any capac-

ity resources contained in the On/Off CoD record. Activa-

tion levels of capacity may change during the 24 hour test

period. The On/Off CoD test automatically terminates at

the end of the 24 hours period. In addition to validating

the On/Off CoD function within your environment, you may

choose to use this test as a training session for your per-

sonnel who are authorized to activate On/Off CoD.

SNMP API (Simple Network Management Protocol Appli-

cation Programming Interface) enhancements have also

been made for the new Capacity On Demand features.

More information can be found in the System z10 Capacity

On Demand User’s Guide, SC28-6871.

Capacity on Demand – Permanent Capacity

Customer Initiated Upgrade (CIU) facility: When your

business needs additional capacity quickly, Customer

Initiated Upgrade (CIU) is designed to deliver it. CIU is

designed to allow you to respond to sudden increased

capacity requirements by requesting a System z10 BC PU

and/or memory upgrade via the Web, using IBM Resource

Link, and downloading and applying it to your System z10

BC server using your system’s Remote Support connec-

tion. Further, with the Express option on CIU, an upgrade

may be made available for installation as fast as within a

few hours after order submission.

Permanent upgrades: Orders (MESs) of all PU types and

memory for System z10 BC servers that can be delivered by

Licensed Internal Code, Control Code (LIC-CC) are eligible

for CIU delivery. CIU upgrades may be performed up to the

maximum available processor and memory resources on

the installed server, as confi gured. While capacity upgrades

to the server itself are concurrent, your software may not be

able to take advantage of the increased capacity without

performing an Initial Programming Load (IPL).

System z9

System z10

Resources

CP, zIIP, zAAP, IFL, ICF

CP, zIIP, zAAP, IFL, ICF, SAP

Offerings

Requires access to IBM/ No password required or

RETAIN

®

to activate

access to IBM/RETAIN to

activate

CBU, On/Off CoD

CBU, On/Off CoD, CPE

One offering at a time

Multiple offerings active

Permanent

Requires de-provisioning Concurrent with temporary

upgrades

of temporary capacity fi rst offerings

Replenishment

No

Yes w/ CBU & On/Off CoD

CBU Tests

5 tests per record

Up to 15 per record

CBU Expiration

No expiration

Specifi c term length

Capacity

Provisioning

No Yes

Manager Support

44

Advertising