Upper cable loop diagram – Impex GS-9 User Manual

Page 14

Advertising
background image

STEP 7 (Upper Cable Loop & Diagram 7)
A.) Attach the 108” Upper Cable (#93) to the front opening on the Upper Frame (#8). Attach a

Pulley (#79) to the opening. Secure it with one M10 x 2 3/8” Allen Bolt (#10), two Pulley
Bushings (#11), and one M10 Aircraft Nut (#5). Draw the Cable towards the back of the
machine. Note: Make sure the Ball Stopper is underneath the frame.

B.) Attach a Pulley to the bracket on the Upper Frame. Secure it with one M10x1 ¾” Allen Bolt

(#98), two

¾” Washers (#6), one L-shaped Pulley Bracket (#86), and M10 Aircraft Nut (#5).

C.) Pull the Cable downward. Install a Pulley with a U-shaped Pulley Bracket (#85) and a Flat

Double Floating Pulley Bracket (#59). Let the bracket hanging for now.

D.) Draw the Cable around the Pulley then upward to the second open bracket on the Upper

Frame. Install another Pulley with a U-shaped Pulley Bracket (#85).

E.) Draw the Cable around the Pulley then downward to the Selector Rod (#69). Securely thread

the end of the Cable into the Selector Rod (#69).

UPPER CABLE LOOP DIAGRAM

13





Advertising