IBM z/OS User Manual

Page 11

Advertising
background image

11

Although CBU and On/Off Capacity on Demand can both

reside on the server, the activation of On/Off Capacity

on Demand is mutually exclusive with Capacity BackUp

(CBU) and no physical hardware upgrade will be sup-

ported while On/Off Capacity on Demand is active.

This important new function for zSeries gives customers

greater control and ability to add capacity to meet the

requirements of an unpredictable on demand applica-

tion environment. On/Off CoD extends zSeries capacity

on demand offerings to the next level of fl exibility. It is

designed to help customers match cost with capacity

utilization and manage periodic business spikes. On/Off

Capacity on Demand is designed to provide a low-risk way

to deploy pilot applications, and it is designed to enable a

customer to grow capacity rationally and proportionately

with market demand.

Customers can also take advantage of Capacity Upgrade

on Demand (CUoD), Customer Initiated Upgrade (CIU),

and Capacity BackUp (CBU) which are described later in

the document.

The z990 has also been designed to offer a high perfor-

mance and effi cient I/O structure. All z990 models ship

with two frames the A-Frame and the Z-Frame; this sup-

ports the installation of up to three I/O cages. Each I/O

cage has the capability of plugging up to 28 I/O cards.

When used in conjunction with the software that supports

Logical Channel SubSystems, it is possible to have up to

420 ESCON

®

channels in a single I/O cage and a maxi-

mum of 1024 channels across 3 I/O cages. Alternatively,

three I/O cages will support up to 120 FICON

channels

and up to 360 ESCON channels. Each book will support

up to 12 STIs for I/O connectivity. Seven STIs are required

to support the 28 channel slots in each I/O cage so in

order to support a fully confi gured three I/O cage system

21 STIs are required. To achieve this maximum I/O con-

nectivity requires at least a B16 model which provides 24

STIs.

The following chart shows the upgrade from z900 to z990.

There are any to any upgrades from any of the z900 gen-

eral purpose models. A z900 Coupling Facility Model 100

must fi rst be upgraded to a z900 general purpose model

before upgrading to a z990. There are no upgrades from

9672 G5/G6 or IBM

^ zSeries 800 (z800).

Model Upgrades

z900

z990

100

101 - 109

A08

B16

C24

D32

1C1 - 116

2C1 - 216

Advertising