Advanced availability functions – IBM z/OS User Manual

Page 31

Advertising
background image

31

the processors in the takeover site to acquire processing

power required to restart mission-critical production work-

loads. GDPS-CBU management helps to minimize manual

customer intervention and the potential for errors, which

can help reduce the outage time for critical workloads from

hours to minutes. Similarly, GDPS-CBU management can

also automate the process of dynamically returning the

reserved CPs when the temporary period has expired.

z990 Server Customer Initiated Upgrade (CIU)

Customer Initiated Upgrade (CIU) is the capability to initi-

ate a processor and/or memory upgrade when spare PUs/

installed unused memory are available via the Web using

IBM Resource Link. Customers will be able to download

and apply the upgrade using functions on the Hardware

Management Console via the Remote Support Facility.

This unique and important function for zSeries gives the

customer greater control and ability in adding capacity to

the system to meet resource requirements for unpredict-

able e-business workloads and for applications which

are diffi cult to size. CIU is a low-risk, well tested-and-tried

function.

Transparent Sparing

z990 offers a 12 PU MCM with 2 PUs reserved as spares.

In the case of processor failure, these spares are used for

transparent sparing.

Enhanced Dynamic Memory Sparing

The z900 has enhanced this robust recovery design with

16 times more chips available for sparing. This will virtually

eliminate the need to replace a memory card due to DRAM

failure.

Enhanced Storage Protect Keys: z990 has enhanced the

memory storage protect key design by adding a third key

array to each memory card. The arrays are parity checked

and employ a Triple Voting strategy to assure accuracy.

This will reduce the need for memory card replacement

due to key array failure.

ESCON Port Sparing: The ESCON 16-port I/O card is

delivered with one unused port dedicated for sparing in

the event of a port failure on that card. Other unused ports

are available for nondisruptive growth of ESCON channels.

Concurrent Maintenance

• Concurrent Service for I/O Cards: All the cards which

plug into the new I/O Cage are able to be added and

replaced concurrent with system operation. This virtually

eliminates any need to schedule outage to service or

upgrade the I/O subsystem on this cage.

• Upgrade for Coupling Links: z990 has concurrent main-

tenance for the ISC-3 adapter card. Also, Coupling Links

can be added concurrently. This eliminates a need for

scheduled downtime in the demanding sysplex environ-

ment.

Advanced Availability Functions

Advertising