IBM Nortel 10 User Manual

Page 21

Advertising
background image

4.

Remove

the

filler

module

from

the

selected

bay.

Store

the

filler

module

for

future

use.

5.

If

you

have

not

already

done

so,

touch

the

static-protective

package

that

contains

the

GbE

switch

module

to

any

unpainted

metal

surface

of

the

BladeCenter

unit

or

any

unpainted

metal

surface

on

any

other

grounded

rack-component

for

at

least

2

seconds.

6.

Remove

the

GbE

switch

module

from

its

static-protective

package.

7.

Make

sure

that

the

release

latch

on

the

GbE

switch

module

is

in

the

open

position

(perpendicular

to

the

module).

8.

Slide

the

GbE

switch

module

into

the

applicable

I/O-module

bay

until

it

stops.

I/O module

Release latch

RS232

TX/RX

LINK

1

TX/RX

LINK

2

TX/RX

LINK

3

TX/RX

LINK

4

3

9.

Push

the

release

latch

on

the

front

of

the

GbE

switch

module

to

the

closed

position.

After

you

insert

and

lock

the

GbE

switch

module,

it

is

turned

on,

and

the

power-on

self-test

(POST)

runs

to

verify

that

the

GbE

switch

module

is

operating

correctly.

The

POST

results

are

displayed

by

the

status

LEDs.

10.

Make

sure

that

the

LEDs

on

the

GbE

switch

module

indicate

that

it

is

operating

correctly.

Make

sure

that

the

OK

LED

on

each

GbE

switch

module

is

lit.

See

“LEDs”

on

page

6

for

a

description

of

the

operation

of

these

LEDs.

11.

If

you

have

other

GbE

switch

modules

to

install,

do

so

now;

otherwise,

go

to

step

12.

Chapter

2.

Installing

and

removing

the

GbE

switch

module

11

Advertising