Pre-operation – John Deere AC-G3200i User Manual

Page 24

Advertising
background image

Preparing the Generator

24

Operator’s Manual

PRE-OPERATION

BATTERY INSTALLATION:

1. Attach terminals to a lead-acid battery already charged.

Mount the battery onto the position as specified below, with

its terminals facing inward.

2. Insert each long bolt through the specified hole, its tip pointing

outward.

3. Put the supporting arm on the long bolts and tighten with

the butterfly nuts. (Push the lead-acid battery all the way

inward.)

4. Arrange the wiring so that it won’t be damaged by possible

vibration caused by the engine.

5. Only after checking that the engine’s starter key in the “OFF”

position, securely connect the red cable, to the positive (+)

terminal. And then connect the other cable to the negative (-)

terminal.

Red Cable: to the (+) terminal
Black Cable: to the (-) terminal

RECOMMENDED BATTERY

LEAD-ACID BATTERY

AC-G3200i

AC-G4300i

USA

SW7L-BS

SW12AL-A

CANADA

SWC7L-BS

SWC12AL-A

CAUTION: ENGINE DAMAGE WILL OCCUR IF THE TERMINAL CONNECTIONS

ARE CONNECTED IN THE INCORRECT MANNER.

RED CABLE

RED

CABLE

5

LESS THAN

131 mm [5.2 in.] (AC-G3200i)

162 mm [6.4 in.] (AC-G4300i)

LESS THAN

114 mm [4.5 in.] (AC-G3200i)

136 mm [5.4 in.] (AC-G4300i)

LESS THAN

71 mm [2.8 in.] (AC-G3200i)

82 mm [3.2 in.] (AC-G4300i)

1
2
3
4
5

1

6

2

3

4

Battery Base
Flange Bolt
Screw

Accessory parts

Battery Band
Bolt and Nut

6 Battery cover

Advertising