J-300 series, Figure b control box – Jacuzzi J - 355 User Manual

Page 21

Advertising
background image

17

J-300 series

J-300 Series

Figure B Control Box

TB1

3

2

1

1. Terminal Block

2. Bonding Lug

3. Grounding Terminal

GRN

WHT

WHT

BLK

BLK

BLK

RED

1

2

3

Figure-C

TB1

to Circuit
Board

Power In

GRN

WHT

WHT

BLK

BLK

BLK

RED

RED

RED

1

2

3

Figure-D

TB1

to Circuit
Board

Power In

Move Red
Wire Here

north american Convertible

models: 120 VAC, 3-Wire Connection

60 Hz

north american Convertible

models: 240 VAC, 4-Wire Connection

60 Hz

Caution (For 4-wire 240 vaC Heater operation): Move the red

wire on the main terminal strip (TB1) from position #1 to position #3.

Make certain wires are connected exactly as shown in Figure D before

applying power. Failure to do so will result in damage to the circuit

board and/or related components and void the manufactures warranty.

BLK

RED

RED

RED

BLK
BLK

1

2

Figure-E

TB1

to Circuit
Board

Power In

Green

TB3

1

2

BLUE

BLUE

BROWN
BROWN

Figure-F

TB1

to Circuit
Board

Power In

Green

TB3

north american 240v models:

240 VAC, 3-Wire Connection 60 Hz

all export models: 230 VAC, 3-Wire

Connection 50 Hz

17

Advertising
This manual is related to the following products: