Figure a-15. cluster topology, Step 1, Appendix: sample configurations a-25 – SANRAD I3.1.1205 User Manual

Page 325

Advertising
background image

Appendix: Sample Configurations

A-25

1

Eth 1: 212.199.43.41

Eth 1: 212.199.43.56

10235

V Switch 1

V Switch 2

Fibre Channel

Connection

Eth 1: 212.199.43.42

2

Cloud

IP address:

212.199.43.40

Eth 1: 212.199.43.75

Disk 1

Disk 2

Disk 4

Disk 3

2

2

1

Initiator Target:

212.199.43.56

Etherne

t

LAN B

Initiator Targets:

212.199.43.75
212.199.43.56

Tower box

Host 2

IP address:

212.199.43.70

Tower box

Host 1

IP address:

212.199.43.50

Telnet

Station

JBOD 1

Figure A-15. Cluster Topology

STEP 1.

ATTACH CABLES

Attach an HSSDC-DB9 fibre channel cable from your JBOD appliance to one
of the storage ports on the back panel of V-Switch 1. See #1 in Figure

A-15. Depending on your appliance, you need to plug a terminator into one
of the JBOD ports.

Attach an RJ45 copper 1 Gbit Ethernet cable from the Ethernet port Eth1
on the front panel of V-Switch 1 to your Telnet terminal. See #2 in Figure

A-15. Attach another RJ45 copper 1 Gbit Ethernet cable from the Ethernet
port Eth1 on the front panel of the second V-Switch, Vswitch2, to your
Telnet terminal.

Advertising