Hardware setup 2 – Lava Computer PAYLINK IP/232 User Manual

Page 3

Advertising
background image

Hardware Setup

2

1. Connect the power supply to the

and to

AC power. The power (red) LED will light to indicate that the
unit is receiving power.

2. Connect

to the Ethernet RJ-45 jack

of the

. Attach the other end of the

crossover network cable to a host PC directly.

Network status is indicated by two LEDs on the RJ-45 connector.
The left (yellow) LED indicates network activity. It is on by default,
turning off when network activity occurs at the PayLink-IP. The right
(green) LED indicates a network link. It is off by default, but lights
when a network link exists.

LAVA PayLink-IP/232

an Ethernet cross-over cable

LAVA PayLink-IP/232

Power

connector

Power

indicator

Network

connector (RJ-45)

Network

Activity and Link

indicators

Advertising