Life Fitness G4 User Manual

Page 19

Advertising
background image

S

TEP

16:

• Route the LAT CABLE (AM) through the PRESS ARM SUPPORT FRAME (X) and assemble one

3-1/2” PULLEY (35) to the FRAME PRESS ARM SUPPORT FRAME (X) using one 3/8 X 8” BOLT
(3), two 3/8” WASHERS (18), two 3/8 X 1-1/4” SPACERS (25) and one 3/8” SILVER LOCK NUT
(19). See FIGURE 16.

• Route the LAT CABLE (AM) through the FRAME (A) and assemble one 3-1/2” PULLEY (35) to

the FRAME (A) using one 3/8 X 3-3/4” BOLT (6), two 3/8 X 1-1/16” FLANGE SPACERS (26) and
one 3/8” SILVER LOCK NUT (19). See FIGURE 16.

• Route the LAT CABLE (AM) around one 3-1/2” PULLEY (35) and assemble the PULLEY to the

DOUBLE FLOATING PULLEY BRACKET ASSEMBLY (AA) using one 3/8 X 1-3/4” BOLT (11) and
one 3/8” SILVER LOCK NUT (19). See FIGURE 16.

NOTE: Make sure the cable runs in the grooves of the pulleys.

18

F

IGURE

16

0

1

2

3

4

5

6

1/2

1/2

1/2

1/2

1/2

1/2

Advertising