Figure 1. installing the fp-do-403, Installing the cfp-do-403 – National Instruments FP-DO-403 User Manual
Page 2

[c]FP-DO-403
2
ni.com
2. Align the FP-DO-403 alignment slots with the guide rails on
the terminal base.
3. Press firmly to seat the FP-DO-403 on the terminal base. When
the module is firmly seated, the terminal base latch locks it into
place.
Figure 1. Installing the FP-DO-403
Installing the cFP-DO-403
The cFP-DO-403
mounts on a Compact FieldPoint backplane
(cFP-BP-x), which provides operating power to the module.
Installing the cFP-DO-403
onto a powered backplane does not
disrupt the operation of the bank.
To install the cFP-DO-403, refer to Figure 2 and complete the
following steps:
1. Align the captive screws on the cFP-DO-403
with the screw
holes on the backplane. The alignment keys on the
cFP-DO-403
prevent backward insertion.
2. Press firmly to seat the cFP-DO-403
on the backplane.
3. Using a number 2 Phillips screwdriver with a shank of at least
64 mm (2.5 in.) length, tighten the captive screws to 1.1 N
⋅ m
(10 lb
⋅ in.) of torque. The nylon coating on the screws prevents
them from loosening.
1
I/O Module
2
Terminal Base
3
Alignment Slot
4
Key
5
Latch
6
Guide Rails
1
3
2
4
5
6