Connect Power to the FBUS-HSE/H1 LD

Each FBUS-HSE/H1 LD on your network requires an 11-30 VDC power
supply.

The power connector is a 6-pin screw terminal power connector whose
pinout is shown in Figure 2-7.

Figure 2-7. FBUS-HSE/H1 Power Connector Pinout

Connect the primary power supply to the center V and C pair with the
positive and negative wires on your power cable in the V and C terminals,
respectively. You can connect an optional backup power supply to the left
V and C pair. The right V and C pair provides the same power supply as the
primary power supply.

Power on the FBUS-HSE/H1 LD

At power-up, the FBUS-HSE/H1 LD runs a set of power-on self tests
(POST) that take several seconds and the green POWER LED is lit.
For more information about reading the POST status, refer to the

LED

Indicators

section of Appendix B,

Troubleshooting

.

v

v

v

c

c

c

11-30 VDC

Backup Power

Supply

(Optional)

+

+

11-30 VDC

Primary Power

Supply

V

C

To Adjacent Device

(Optional Connection)

Advertising