Navigation – Nortel Networks NN46200-310 User Manual

Page 22

Advertising
background image

22

Introduction

Table 1
Task and estimated time

Task

Estimated Time

Preparing cable for installation

5 minutes for each power supply

Removing the power filler panel

1 minute for each power supply

Installing the DC power supply

2 minutes for each power supply

Removing the DC power supply cover

1 minute for each power supply

Cabling the DC power supply using
washers and lugs

5 minutes for each power supply

Replacing the DC power supply cover

1 minute for each power supply

Navigation

“DC power supply fundamentals” (page 23)

“DC power supply installation” (page 27)

“Technical specifications” (page 47)

Nortel Ethernet Routing Switch 8300

Installation — DC Power Supply

NN46200-310

01.01

Standard

9 June 2008

Copyright © 2008 Nortel Networks

.

Advertising