Procedure steps, Job aid: power filler panel removal, Installing the dc power supply – Nortel Networks NN46200-310 User Manual

Page 31

Advertising
background image

Installing the DC power supply

31

CAUTION

To maintain proper cooling, never operate the chassis with an
empty power supply bay. If you replace a failed power supply
and you have no power filler panel, leave the failed power
supply installed until a replacement power supply is available.

Procedure steps

Step

Action

1

Use a Phillips screwdriver to loosen the two captive screws that
secure the power filler panel to the chassis until the power filler
panel disengages.

See

“Job aid: Power filler panel removal” (page 31)

.

2

Pull the power filler panel from the chassis.

CAUTION

Save the power filler panel in case you need to
operate the Ethernet Routing Switch 8300 chassis
with a power supply removed.

--End--

Job aid: Power filler panel removal

Installing the DC power supply

Install the DC power supply to the DC input power source of the Ethernet
Routing Switch 8300.

Nortel Ethernet Routing Switch 8300

Installation — DC Power Supply

NN46200-310

01.01

Standard

9 June 2008

Copyright © 2008 Nortel Networks

.

Advertising