Assembly and initial set-up – North Star M157594I User Manual

Page 13

Advertising
background image

Assembly and Initial Set-Up

13




Step 2. Trailer Assembly

WARNING: The pressure washer is heavy. It can crush and cause serious injury if it rolls
out of control or tips over. Follow all assembly instructions exactly as presented below.

1.) Remove the top and four sides of the

steel crate.

2.) Remove A-frame from trailer frame.

(Keep fasteners for step 7)

3.) Slide A-frame into holders under

trailer frame (built into the front posts).

4.) Install jack onto A-frame with 3/8x1"

bolts, 3/8" lock nuts, and washers
provided. Tighten to 37 ft.-lbs.

5.) Slide caster wheel onto jack and secure

with pin.

6.) Crank jack down until A-frame

becomes level (parallel to ground).

7.) Attach A-frame to trailer frame with

six 5/8" bolts, Class G nuts and
washers. Tighten to 180 ft.-lbs. Use a
torque wrench.

8.) Check trailer light wire routing though

A-frame, make sure wires are not
pinched, stretched, or pass any rough
edges.

9.) Crank jack down farther (so A-

frame goes up) to take weight
off front shipping posts.

10.) Remove front shipping posts.
11.) Crank jack up as far as it will

go (so A-frame goes down and
weight is applied to wheels)

12.) Disconnect rear shipping posts

from frame (remove only the
bolts at the top of the rear
shipping posts)

13.) Roll trailer forward until it is

free of the rear shipping posts.


Front Shipping
Posts

Rear Shipping Posts

(one on each corner)


A-frame

Caster
wheel

Jack

Trailer
Frame

Front post

Advertising