Nighthawk chassis installation – Nighthawk SILVER STRIKE BOWLING User Manual

Page 12

Advertising
background image

Silver Strike Bowling™

Version 08/04

Page 10

© Copyright 2004 Incredible Technologies, Inc. All Rights Reserved. Unauthorized duplication is a violation of applicable law.

All other marks are the properties of their respective owners. All rights reserved.

Nighthawk Chassis Installation

The Nighthawk Chassis houses most of the game electronics and hardware
into one box that can be easily installed. Verify that the Nighthawk Chassis
Power Switch is in the "ON" position.

1. Locate the area on the floor where the chassis will be placed. Make

sure there is enough clearance to plug in cables.

q

The Nighthawk Chassis measures 19" W x 7" H x 11" D.

2. Relocate and secure any wires to make room for the chassis.

3. Place the chassis so it sits flat on the floor and does not pinch wires.

4. Mount the chassis with 6 - #6 x ¾" Hex Washer Head Sheet Metal

Screws.

5. Cable Attachments. I/O power, Audio, USB cables. Refer to page 45.

q

I/O board power cable from the I/O board to one of the two power
output connectors on the chassis.

q

Audio cables to the audio output jacks of the chassis. Match the
appropriate colors.

q

USB cable #1 from the I/O board to any USB port on the chassis.

q

USB cable #2 for future updates. Attached to any USB port on the
chassis. Route the other end near the coin door opening for easy
access.

q

USB cable #3 Cabinet Identification Device (C.I.D.) connect to any
USB port on the chassis. See C.I.D. Installation Section. (Page 11)

6. VGA Video Cable Attaches to the video out on the chassis to…

q

I/O board video in for Low or Medium Resolution monitors.

q

VGA or SVGA monitors, Directly to the VGA or SVGA monitor input.

q

See Dip Switch settings on page 15 for proper set up.

7. AC power cord plugs into the Chassis. Have a qualified electrician do the wiring. Verify A.C. main voltage

selector switch is in the proper position. In North America the setting is 115 volts AC. In some countries
this should be set at 230 VAC.

8. Use cable clamps, with appropriate tension, where necessary to ensure all cables stay in place during

operation.

9. Dress all cables with additional clamps and wire tie wraps where needed.


Refer to the diagrams on this page as well as a detailed diagram on page 45 for correct placements of Nighthawk
Chassis, C.I.D., and cables from the Chassis to I/O board to peripherals:











Advertising