Step 7.1 burner tube installation, Step 7.2 burner installation, 1 burner tube installation 7.2 burner installation – Roberts Gorden Vantage twin Fire Unitary Infrared Heater TF-250 User Manual

Page 27

Advertising
background image

SECTION 7: H

EATER

I

NSTALLATION

21

Step 7.1 Burner Tube Installation

Step 7.2 Burner Installation

7' 6" ± 1'

(229 cm ± 25 cm)

S-hook

Burner Tube

Hanger

29"± 2"

(73 cm ± 5 cm)

NOTE:

Tubing requires a downward

slope of 1/2" (13 mm)

per 20' (6 m) away

from burner.

Weld seam

must be to the

bottom of the tube.

Offset mounting

hole must be

to the top.

Description

Part Number

Burner Tube

03051XXX

S-Hook

91907302

Tube/Reflector Hanger

03090100

Lock Washer

Gasket

Burner

Bolt

Description

Part Number

Bolt

94273914

Lock Washer

96411600

Gasket

02568200

Burner

090XXXXX

Advertising