Figure 19: u-tube heater layout overview – Roberts Gorden Vantage twin Fire Unitary Infrared Heater TF-250 User Manual

Page 35

Advertising
background image

SECTION 8: O

PTIONAL

H

EATER

A

CCESSORIES

29

FIGURE 19: U-Tube Heater Layout Overview

LEGEND

a = 14" (36 cm)

reflector width (not shown)

b = 2" (5 cm)

end cap to burner

c = 2" (5 cm)

end cap to hanger

d = 7'6" (229 cm)

distance first hanger

e = 10' (305 cm)

distance between hangers

f = 5' (153 cm)

distance between last full tube

hanger and half tube hanger

g = 17.5" (44 cm)

burner length

h = 9.5" (24 cm)

burner height

*Requires the last reflector

before the u-tube to be cut

in half for use on both sides.

**Requires the last tube before

the u-tube to be cut in half for

use on both sides.

U-tube

Burner

Reflector

Tube 10' (3 m)

Tube/Reflector

Hanger
Coupling

Assembly

Tube 5' (1.5 m)**

c

b

d

e

f

50' (15 m) Tube Length* ** (Each Side)

h

g

c

b

d

e

40' (12 m) Tube Length (Each Side)

h

g

c

b

d

f

30' (9 m) Tube Length**(Each Side)

h

g

c

b

20' (6 m) Tube Length* (Each Side)

e

h

g

U-tube layouts showing one side. Use same measurements for the other side.

Advertising