6. Replace cover on drain box and lower vent pipe into

the drain box.

10.9 Steam Generator

P/N 094128 and 123655

1. Shut off power, water and gas supply to the steamer.

2. Turn main gas valve to the OFF position.

3. Disconnect the water inlet hose, steam hose and

drain hose by loosening the hose clamps and

working the hose off the respective fitting.

4. Disconnect the two boiler manifold gas lines from the

gas solenoid valves.

5. Disconnect “spark” lead from igniter module and

disconnect the two boiler manifold gas lines from the

manifold. Remove the gas lines from the unit.

6. Remove flame holders and/or jets if necessary.

7. Disconnect pilot line from the main gas valve.

8. Disconnect “spark” lead from igniter module and pilot

burner.

9. Remove pilot burner.

10. If identification is missing from the water level probe

electrical leads, identify and mark them at this time.

11. Disconnect the electrical lead from the water level

probe which is being removed, and carefully remove

the probe. Be careful not to damage the ceramic

material on the probe.

12. Clean the probe and the probe holder.

13. Inspect the probe and its ceramic for damage. If

damaged, replace the probe.

14. Disconnect boiler temperature probe leads from

harness.

15. Remove temperature probe. If male fitting was

removed with the probe and compression nut,

remove it from the probe.

16. With a socket wrench, remove the four 1/4-20 bolts

holding the steam generator to the steamer table.

17. The entire steam generator (with fittings attached)

may now be removed. Remove outer bolt from the

side and inner bolt from the rear.

18. Once the steam generator has been removed, the

fittings and probes may be transferred to the new

steam generator. Make sure that all screw fittings are

installed using high temperature pipe compound.

NOTE: Refer to appropriate sections for detailed

instructions on fittings and heater assembly.

19. Install new boiler in the reverse order of removal.

20. Attach the water inlet hose, drain hose and steam

hose. Tighten hoses around fittings with hose clamps

10.10

Steam Generator Probes (High and Low

Water) P/N 070178.

1. Shut off power to the steamer.

2. With a wrench LOOSEN, but do not remove the nuts

holding the wire(s) on the probe terminal(s)

3. The wires are connected to wire fork terminals.

These will "snap" on and off the terminal post. "Un-

snap" them by gently pulling on the terminal.

4. Using an open ended wrench, turn the probe

counter-clockwise to remove.

To Install:

5. Apply high temperature pipe compound to the probe

and screw it in by hand. Using an open ended

wrench, tighten the probe into the fitting.

6. Replace the wire(s) to the probes by snapping the

fork terminals around the terminal post. Using a

wrench, tighten the terminal nut.

NOTE: If two probes are to be replaced, either

replace them one at a time or note the color of the

wires attached to the probes. Do not get them mixed

up.

10.11

Main Gas Valve and Gas Pressure

Adjustment P/N 122158

1. Disconnect power to the steamer.

2. Remove the front and side panels, as described in

Section 10.2, above.

3. Turn the manual gas valve to the closed position.

Disconnect the wire to the solenoids.

4. Note the color and position of the two connectors for

assembly.Remove the aluminum tubing from the

Advertising