Om/sm-hy-6g(ce) – Unified Brands HYPERSTEAM HY-6G(CE) User Manual

Page 27

Advertising
background image

OM/SM-HY-6G(CE) 

OM/SM-HY-6G(CE)

27

terminals from the igniter module. Be careful not to

pull the terminal by the wire. Use needle nose pliers

to grip onto the terminal itself.

5. Remove the screws that secure the igniter manifold.

6. Remove the igniter module.

To Install:

7. Position the new igniter against the back wall of the

electrical compartment.

8. When all four screws are partially threaded, tighten

them one at a time.

9. Plug in each of the terminals. Double check to

ensure that they are in the correct location.

10.14

Pilot Switch (SW3) Removal

P/N 087951

1. Shut off the power supply. Disconnect the four color

coded wires from the switch assembly.

2. The switch snaps into the metal plate where it is

retained by plastic tabs on the top and bottom. To

remove the switch from the plate, press in on both

tabs at the same time and slide the switch out of the

bracket hole.

To replace the switch

3. Insert the new switch into the bracket hole until its

tabs clear the hole and snap into position.

4. Reattach the wires to the switch.

10.15

Pilot Burner Replacement/Current Check/

Adjustment - Pilot Flame Sensor

Replacement

P/N 123641)

P/N 003328 Flame Sensor

1. Turn off the main gas and power supply.

2. Remove the front cover.

3. Remove the right side panel as described in

Paragraph 10.2.

4. Turn the manual gas valve to the OFF position. Turn

the pilot switch to the OFF position.

5. Disconnect the pilot line from the pilot burner.

6. Disconnect the “spark” lead from the pilot burner.

7. Remove the flame sensor from the flame sensor

bracket.

8. Remove the pilot burner.

Installation:

9. Connect the pilot line to the pilot burner.

10. Connect the “spark” lead to the pilot burner. Be sure

to route the lead around the outside of the gas lines.

11. Replace the flame sensor on the flame sensor

bracket.

12. Apply anti-seize lubricant to mounting head screw

threads. Install the pilot burner and flame sensor

assembly, and tighten the screws.

NOTE: Route the “spark” lead and flame sensor wire

away from the manifold to prevent improper

operation.

13. Turn manual gas valve to the ON position.

14. Connect unit to the branch circuit and turn on the

main gas supply.

15. Place pilot switch SW3 in the ON position. Check for

gas soundness.

Pilot Flame Current Check

WARNING

WHEN STEAMER POWER IS TURNED ON, THERE IS

HIGH VOLTAGE PRESENT IN THE ELECTRICAL

COMPONENTS COMPARTMENT. BE SURE THAT

STEAMER IS DISCONNECTED FROM BRANCH

CIRCUIT BEFORE PERFORMING ANY REPAIRS.

1. Turn off steamer power.

2. Disconnect the ground (green) wire from the igniter

module.

3. Connect a DC micrometer between the igniter

ground terminal and the disconnected green wire.

Advertising