Mobile home installation – United States Stove Company PELLET 5660(I) User Manual

Page 24

Advertising
background image

24 

MOBILE HOME INSTALLATION 

Mobile home installation should be done in accordance with the Manufactured Home and Safety Standard (HUD), CFR 3280, 
Part 24. Canadian installations require that the heater must be connected to a 3 or 4 inch, factory‐built chimney conforming 
to CAN/ULC‐S629. See the installation illustrations in this manual for minimum height above the roof. U.S. Stove suggests the 
use  of  Selkirk’s  Pellet  Venting  Products.  Refer  to  their  installation  instructions  for  proper  installation  of  the  exhaust  and 
combustion  air  intake.  The  chimney  installation  must  allow  for  removal  in  case  of  mobile  home  transportation,  especially 
outside connections. You may contact your local building authority or person having jurisdiction on height restrictions. 

In order for this unit to be installed in a mobile home the following criteria must be met: 

 The unit must be secured to the floor using lag bolts in the holes provided in the pedestal base. 
 Ensure that the unit is permanently electrically grounded to the chassis of your home. 

IT  IS  MANDATORY  TO  TAKE  THE  COMBUSTION  AIR  FROM  THE  OUTSIDE  WHEN  INSTALLING  THIS  UNIT  IN  AIR  TIGHT  OR 
MANUFACTURED/MOBILE HOMES. 

CAUTION:  THE  STRUCTURAL  INTEGRITY  OF  THE  MANUFACTURED  HOME  FLOOR,  WALL,  AND  CEILING/ROOF  MUST  BE 
MAINTIANED. MAKE SURE TO MAINTAIN AN EFFECTIVE VAPOR BARRIER BY SEALING WITH SILICONE WHERE THE CHIMNEY OR 
OTHER  COMPONENTS  PENETRATE  TO  THE  EXTERIOR  OF  THE  STRUCTURE.  REFER  TO  AND  FOLLOW  THE  CHIMNEY 
MANUFACTURER’S INSTALLATION INSTRCUTIONS. 

WARNING: DO NOT INSTALL IN SLEEPING ROOM. 

                         

 

 

NOTE: Only the freestanding model is for installation into a mobile home. 
 

Advertising
This manual is related to the following products: