Caution – Vanguard Managed Solutions Vanguard 6500 PLUS User Manual

Page 75

Advertising
background image

Installation

2-67

DSU DIM Installation

Installation
Procedure

Follow these steps to install the DSU DIM:

Caution

Be sure that the telco plug is disconnected before the EIM is disconnected from the
6500

PLUS

. Also, do not connect the telco plug to the EIM until the EIM has been

connected to the 6500

PLUS

.

Software supporting the DSU option is necessary for the 6500

PLUS

to recognize the

DSU hardware. The provided software requires an NSO or similar equipment to
(remotely) download the software, and a Flash card.

Control Terminal
Port

For configuration, reporting, and troubleshooting the CTP port must be used.
Network Management is not supported for the Integral DSU option.

Step

Action

1

Install the DSU DIM in the DTE position only (see Figure 2-23).

The DSU option does not operate if the DIM is installed in the DCE
position.

2

Set the jumpers properly.

This option requires the jumpers be set for the high speed 1 setting
(M1/HS). This is the same jumper location listed for the V.35, V.36,
and X.21 interfaces on standalone or Modulus 8/18 hardware.

3

Plug the EIM into the backplane connector corresponding to the DIM
port containing the DSU DIM (Port 1 or 2). Verify that the EIM is
only connected to a port that has a DSU DIM installed.

4

Tighten the connector mounting screws to provide proper grounding
and ensure signal integrity.

Advertising