Prepare boiler location — air openings, Gold cga gas-fired water boiler — boiler manual, Air opening options – Weil-McLain Gold CGa User Manual

Page 10: Air openings must be provided

Advertising
background image

GOLD CGa Gas-Fired Water Boiler — Boiler Manual

10

Part Number 550-101-009/0107

Figure 5

Air from outdoors — horizontal ducts

Figure 4

Air from outdoors — vertical ducts

Figure 2

Air openings to interior spaces

Figure 3

Air directly through outside wall

Air opening options

Two openings — Air supply from inside the building

✷

1. If the building is of

unusually tight construction

(see definition, next

page), the

building must also be provided with air openings directly

to the outside

, sized and located per Figure 3, Figure 4 or Figure 5.

. Buildings of typical construction should provide adequate combustion

air from natural infiltration, so additional air openings to the building

are not required.

3. See Figure . Provide

two openings

through the interior wall, within

1 inches of the ceiling and the floor, sized per Figure .

Two openings — Air supply directly from outside

✷

1. Air openings must be directly through an outside wall, or into a space

that connects directly to the outside (such as a ventilated attic or crawl

space, for example).

. See Figure 3 —

Openings directly through an outside wall

— provide

two openings

within 1 inches of the ceiling and the floor, sized per

Figure 3.

3. See Figure 4 —

Air supplied through vertical ducts

— provide

two

openings

terminated within 1 inches of the ceiling and the floor, sized

per Figure 4.

4. See Figure 5 —

Air supplied through horizontal ducts

— provide

two openings

within 1 inches of the floor and the ceiling, sized per

Figure 5.

Prepare boiler location — air openings

1e

Air openings must be provided

Combustion air and ventilation opela4 BDC 10 0 ActualText<FEFF000>>> BDC ( )TjEMC 588EMC 1.3m((o)3)(e)-(d)]TJ/Span<</ActualText<FEFF000>>> BDC ( )T3EMC 1.54 [(mp4(e)y(la4 BDC 10 0 ActualText<FEFF000>>> BDC ( )TjEMC 51EMC 1. 0 Td(the)Tj/Span<</ActualText<FEFF000>>> BDC ( )T13EMC 1.5N)33(3(nt)-3(ilatal(la4 BDC 10 0 ActualText<FEFF000>>> BDC ( )TjEMC 5EMC 1.F1 0 ud[(sl(la4 BDC 10 0 ActualText<FEFF000>>> BDC ( )TjEMC-.535C -.434(Ga (openings)Tj/Span<</ActualText<FEFF000>>> BDC ( )T8EMC 0.4354 T-d[((v)-15(id)3(e)]TJ/Span<</ActualText<FEFF000>>> BDC (.3jEMC 5.ANSI(openings)Tj/Span<</ActualText<FEFF000>>> BDC (0 18EMC 1.Z 0 Td(1)Tj/Span<</ActualText<3FF003000>>> BDC ( ) )T-)3(n9(eo)3)(e)-(d)]TJ/Span<</ActualText<FEFF000>>> BDC (5 185EMC 0.d[(sii(nt)-3(ilatiling)-1(,)]TJ/Span<</ActualText<FEFF003.04BDC .833 0 Td( )T8EMC 4.559[(p)-5(e)3(r)]TJ/Span<</ActualText<FEFF000>>> BDC (1.1EMC .a8 0 )-cab)(sl)-15(id)3(e)]TJ/Span<</ActualText<FEFF000>>> BDC (4.33EMC 1.5l T-dcal(la4 BDC 10 0 ActualText<FEFF000>>> BDC ( )TjEMC.1EMC 1.5(C)8(ildp)-5la4 BDC 10 0 ActualText<FEFF000>>> BDC ( )TjEMC 555EMC 1.54 [(-d[((v)s.ling)-1(,)]TJ/Span<</ActualText<FEFF000>434BDC .833 0 Td(-9.jE -.434 -C)4(a(e)at)e)aa-d[(e)ai)e)aa-1at)-3(io)3(n)]TJ/Span<</ActualText<FEFF00 5858BDC .833 0 Td( )34EMC 1.5i(e)at)e)as)e)at)e)aa-1al5(e)l)e)aa-1atestion