Venting and combustion air, Cgs-4e gas-fired water boiler — boiler manual – Weil-McLain GOLD CGS-4E User Manual
Page 24

Part number 550-110-282/1108
24
GOLD
CGs-4E Gas-Fired Water Boiler — Boiler Manual
Venting and combustion air
4
Install vent piping and air piping per appropriate
Venting Supplement
included in boiler envelope assembly.
Refer to
Venting Supplements
and to manual Section
1
regarding require-
ments for:
• vent system
• combustion air openings
• combustion air quality
CGs-4E Boiler must be
vented and supplied with
combustion and ventilation air
as described in
Weil-McLain CGs
Venting Supplements
packed in
envelope assembly with boiler. Also see Boiler Manual
pages 9 through 11. Failure to do so will cause severe
personal injury or death.
Read and follow the special instructions for the Com-
monwealth of Massachusetts, located on page 36 of this
manual.