Cgs-4e gas-fired water boiler — boiler manual – Weil-McLain GOLD CGS-4E User Manual

Page 36

Advertising
background image

Part number 550-110-282/1108

36

GOLD

CGs-4E Gas-Fired Water Boiler — Boiler Manual

Addendum Instruction for the
Commonwealth of Massachusetts

This addendum must only be used by a
qualified heating installer/service technician.
Read these instructions completely before
beginning the installation. Failure to comply
could result in severe personal injury, death
or substantial property damage.

(a) For all side wall horizontally vented gas fueled equipment

installed in every dwelling, building or structure used in
whole or in part for residential purposes, including those
owned or operated by the Commonwealth and where the
side wall exhaust vent termination is less than seven (7) feet
above finished grade in the area of the venting, including but
not limited to decks and porches, the following requirements
shall be satisfied:

1.

INSTALLATION OF CARBON MONOXIDE DETEC

-

TORS

. At the time of installation of the side wall horizon-

tal vented gas fueled equipment, the installing plumber

or gas fitter shall observe that a hard wired carbon

monoxide detector with an alarm and battery back-up

is installed on the floor level where the gas equipment is

to be installed. In addition, the installing plumber or gas

fitter shall observe that a battery operated or hard wired

carbon monoxide detector with an alarm is installed on

each additional level of the dwelling, building or struc-

ture served by the side wall horizontal vented gas fueled

equipment. It shall be the responsibility of the property

owner to secure the services of qualified licensed profes-

sionals for the installation of hard wired carbon monoxide

detectors
a. In the event that the side wall horizontally vented gas

fueled equipment is installed in a crawl space or an

attic, the hard wired carbon monoxide detector with

alarm and battery back-up may be installed on the

next adjacent floor level.

b. In the event that the requirements of this subdivision

can not be met at the time of completion of installa-

tion, the owner shall have a period of thirty (30) days

to comply with the above requirements; provided,

however, that during said thirty (30) day period, a

battery operated carbon monoxide detector with an

alarm shall be installed.

2.

APPROVED CARBON MONOXIDE DETECTORS

. Each

carbon monoxide detector as required in accordance with

the above provisions shall comply with NFPA 720 and be

ANSI/UL 2034 listed and IAS certified.

3.

SIGNAGE

. A metal or plastic identification plate shall

be permanently mounted to the exterior of the build-

ing at a minimum height of eight (8) feet above grade

directly in line with the exhaust vent terminal for the

horizontally vented gas fueled heating appliance or

equipment. The sign shall read, in print size no less than

one-half (1/2) inch in size, “GAS VENT DIRECTLY BE-

LOW. KEEP CLEAR OF ALL OBSTRUCTIONS.”

4.

INSPECTION

. The state or local gas inspector of the

side wall horizontally vented gas fueled equipment shall

not approve the installation unless, upon inspection,

the inspector observes carbon monoxide detectors and

signage installed in accordance with the provisions of

248 CMR 5.08(2)(a) 1 through 4.

(b)

EXEMPTIONS

: The following equipment is exempt from

248 CMR 5.08(2)(a)1 through 4:
1. The equipment listed in Chapter 10 entitled “Equipment

Not Required To Be Vented” in the most current edition

of NFPA 54 as adopted by the Board; and

2. Product Approved side wall horizontally vented gas fueled

equipment installed in a room or structure separate from

the dwelling, building or structure used in whole or in

part for residential purposes.

(c)

MANUFACTURER REQUIREMENTS — GAS EQUIPMENT
VENTING SYSTEM PROVIDED

. When the manufacturer of

Product Approved side wall horizontally vented gas equip-
ment provides a venting system design or venting system
components with the equipment, the instructions provided
by the manufacturer for installation of the equipment and
the venting system shall include:
1. Detailed instructions for the installation of the venting

system design or the venting system components; and

2. A complete parts list for the venting system design or

venting system.

(d)

MANUFACTURER REQUIREMENTS — GAS EQUIPMENT
VENTING SYSTEM NOT PROVIDED

. When the manufac-

turer of a Product Approved side wall horizontally vented gas
fueled equipment does not provide the parts for venting the
flue gases, but identifies “special venting systems”, the follow-
ing requirements shall be satisfied by the manufacturer:
1. The referenced “special venting system” instructions shall

be included with the appliance or equipment installation

instructions; and

2. The “special venting systems” shall be Product Approved

by the Board, and the instructions for that system shall in-

clude a parts list and detailed installation instructions.

(e) A copy of all installation instructions for all Product Approved

side wall horizontally vented gas fueled equipment, all venting
instructions, all parts lists for venting instructions, and/or all
venting design instructions shall remain with the appliance
or equipment at the completion of the installation.

Advertising