Chapter 2: installing the v7111, Installing the v7111, Unpacking – 3Com V7111 User Manual
Page 13: V7111, Hapter, Nstalling the

C
HAPTER
2:
I
NSTALLING THE
V7111
This section provides information on the installation procedure for the V7111 (see
) and the V7111 24-PORT. For information on configuring the gateway, see
Chapter 3: Configuring the V7111
.
WARNING:
The V7111 is supplied as a sealed unit and must only be installed and serviced by
qualified service personnel.
Units providing power sockets with three pins must be connected by service
personnel to a socket-outlet with a protective earthing connection.
Installing the V7111
To install the V7111, follow these 4 steps:
1
Unpack the V7111 (see
).
2
Check the package contents (see
3
Mount the V7111 (see
).
4
Cable the V7111 (see
After connecting the V7111 to the power source, the Ready and Power LEDs on the front
panel turn to green (after a self-testing period of about 2 minutes). Any malfunction in the
startup procedure changes the Fail LED to red and the Ready LED is turned off (see
for details on the V7111 LEDs).
When you have completed the above relevant sections you are then ready to start
configuring the gateway (see
Chapter 3: Configuring the V7111
Unpacking
To unpack the V7111, follow these 6 steps:
1
Open the carton and remove the packing materials.
2
Remove the V7111 gateway from the carton.
3
Check that there is no equipment damage.
4
Check, retain and process any documents.
3Com VCX V7111 Analog Gateway Installation Guide
13