Installation commissioning 11. commissioning, Settings, Taking the appliance out of use – STIEBEL ELTRON PSH Universal EL с 05.12.2011 User Manual

Page 29

Advertising
background image

En

gl

ish

www.Stiebel-eltron.CoM

PSH UniverSal el|

29

inStallation

CoMMiSSioning

11. commissioning

11.1 commissioning

f

f Open the shut-off valve in the cold water line.

f

f Open a draw-off point until the appliance has filled up and

the pipework is free of air.

f

f Observe the maximum permissible flow rate with a fully

opened tap (see chapter "Specification / Data table").

f

f Switch the mains power ON. The appliance carries out a

self-test.

f

f Check the function of the appliance.

f

f Check the function of the safety valve.

11.1.1 appliance handover

f

f Explain the appliance function to users and familiarise them

with its operation.

f

f Show the user the safety valve and its operating instructions,

and explain its significance.

f

f Make the user aware of potential dangers, especially the risk

of scalding.

f

f Hand over these instructions.

11.2 returning into use

See chapter "Commissioning".

12. settings

12.1 switching on commercial mode

26

�0

2�

07

�0

29

6

S Jumper ECO (energy saving mode)

E ECO ON (factory setting)

A ECO OFF (commercial mode)

f

f To switch on commercial mode, replug the jumper.

12.2 switching on reverse control

26

�0

2�

07

�0

29

6

R Reverse control jumper

E Reverse control ON

A Reverse control OFF (factory setting)

f

f To switch on reverse control, replug the jumper.

13. taking the appliance out of use

f

f Disconnect the appliance from the mains at the MCB/fuse in

the fuse box.

f

f Drain the appliance. See chapter "Maintenance / Draining the

appliance".

Advertising