Hotchkis 2251 1994-Up Mustang Sport Sway Bars User Manual

Page 6

Advertising
background image

6

12)

Make sure the axle is sitting at normal driving height!

Now your ready to tighten

everything up. Use a 3/4 wrench and ratchet with 3/4 socket tighten up the end link
bolts. Use a ratchet with a 18mm socket to tighten the upper end link nuts on the quad
shock mounts. Use a 16mm socket to tighten the U-bolt nuts.

13)

Use the clips retained from the sway bar to re-attach the brake line to the control arm.

For stock

lower trailing arms you can simply hold the clip inside the trailing arm and push the

bolt through the original hole. Tighten the bolt down using a 14mm wrench.

For Hotchkis

14)

Make certain that all hardware is tight. Cover the grease fitting with the zerk caps
provided. Remove the jack and jack stands and you’re ready to install the front sway
bar.

lower trailing arms you will need to put the clips onto the plate welded to the

bottom of the arm. You will also have to remove or bend the upper part of the bracket to clear

the arm. Re-use the stock hardware with a 14mm wrench to tighten.

Advertising