10
8)
Place the plastic back around the Hotchkis sway bar and insert the trim pins to hold.
9)
Re-check all hardware for tightness. Remove the jack stands and you’re finished
installing the front sway bar!
IMPORTANT!
Re-check all hardware after the first five miles!