Rear installation instuctions – Hotchkis 2231 1999-2005 GM 1500 4x4 Pick Up Sport Sway Bars, Lowered User Manual

Page 2

Advertising
background image

2228,2229,30,31,32

Silverado/Sierra Installation Instructions

1/12/2011

REAR INSTALLATION INSTUCTIONS


1. Installation of this rear sway may require the partial removal of the fuel tank.

Hotchkis Performance recommends that the fuel tank be as empty as possible.


2. Raise the rear of the vehicle and place it on jack stands (not required but helpful)

3. To determine if the fuel tank needs to be moved, locate the section of the rear frame

rail where the frame mount will be located (on the driver’s side). If you are able to
place the supplied nut plate into the interior of the frame rail than proceed to step 7.

4. Build a support stand for the fuel tank using floor jacks or jack stands and some 2 X

4s. This support stand will allow the tank support straps to be removed and the tank to
be moved toward the passenger side of the vehicle.


5. Open the gas filler door on the body and remove the 2 upper Torx bolts and the lower

plastic fastener.

NUT PLATE

TORX BOLT

TORX BOLT

PLASTIC

FASTNER

LOOK FOR THIS

SECTION ON

THE FRAME

(HIGHLIGHTED

IN WHITE) ON

THE DRIVER’S

SIDE FOR THE
LOCATION OF

THE BRACKET

Advertising