5 connecting to a power supply (cont), 6 switching the moisture analyzer on and off – Ohaus MB45 MOISTURE ANALYZER Manual User Manual

Page 15

Advertising
background image

MB45

13

2.5 Connecting to a Power Supply (cont)

Connect the power cord supplied to the three pin connector located at the
rear of the Moisture Analyzer and to a power source. The Moisture
Analyzer becomes operational as soon as power is applied. The display
will remain off until the On/Off button is pressed.

Allow the Moisture Analyzer to warm up for at least 30 minutes to enable it to
adapt itself to the ambient conditions. If the Moisture Analyzer has been stored in a
very cold environment before installation, it may require several hours for it to
stabilize.

WARNING:
If the power cable supplied is not long enough, use only a proper 3-pin extension
cable with an equipment grounding connector.

2.6 Switching the Moisture Analyzer on and off

Your Moisture Analyzer is on at all times when connected to a power source. The display can be turned
on or off.

To switch the Moisture Analyzer on, press the On/Off button. An internal
diagnostic test is performed; the display lights and the logo and product
name appears followed by the initial display.

-DEFAULT-

100°C / 10:00

1.000 G

0.000

*

GRAMS

TEST ID:
TEMP/TIME:

TARG. WGT:

CLOSE
COVER

To switch the Moisture Analyzer off, press the On/Off button. After the
analyzer has been switched off, it is in the standby mode. If you wish to
perform a test, press the On/Off button again.

As your Moisture Analyzer needs no warm-up time when in the standby
mode and is immediately ready for testing samples, we advise you to
switch the display off by use of the On/Off button and not to disconnect it
from the power supply. This also ensures that the Moisture Analyzer is
always in thermal equilibrium.

Advertising