12.

Install the supplied turbine outlet

pipe onto the front intermediate pipe.

Slide a U-clamp over the slip-joint

on the Banks turbine outlet pipe.

On models 2001 and newer, with a

remaining portion of the heat shield

on the lower section of turbine outlet

pipe, install the U-clamp so that the

heat shield is captured under the “U”

portion of the clamp when the clamp

is in place. Position the clamp so it

is located over the inner ends of the

slots in the slip-joint for proper sealing.

See Figure 4. Install the nuts finger-

tight, do not tighten the clamp at this

time.
Note: If you have a previously-installed

Banks system on your vehicle and the

removal of the upper turbine outlet

pipe is difficult, due to the crimping of

the pipe by the exhaust clamp, cut the

lower pipe 3

3

4

” from its forward edge

and use Banks coupler kit, p.n. 55214.

13.

Install the Banks Brake assembly

onto the outlet of the turbocharger

using the original bolts. Use the

supplied anti-seize compound on the

bolts and tighten them evenly. The

torque specification for these bolts

is 62 In-lb (not ft-lb!). check that the

molded heater hoses will not rub on

the Banks Brake actuator cylinder.

clearance may be provided by sliding

the heater hose fore and aft slightly

in the hose routing brackets on the

passenger side valve cover. on 2003

vehicles only: It is necessary to rotate

the heater valve toward the front of

the vehicle until the vacuum port aims

towards the valve cover. The valve

can be rotated by loosening the hose

clamps located on each end of the

valve housing. Once the valve has

been rotated, the hoses should be

adjusted by moving them rearward

in their mounting brackets until the

hoses and valve have adequate (more

than

1

4

”) clearance between the

actuator.

14.

clamp the turbine outlet pipe

onto the outlet of the brake assembly

using the original turbine outlet

V-band clamp (on systems 55203 or

55206 use supplied v-band in place

of original). Locate the build date of

your truck on the information sticker

inside the driver’s doorjamb. On trucks

built in 1999 or later, position the

v-band clamp as shown in Figure 5

to provide room for tightening. On

trucks built prior to 1999, this position

will interfere with the cylinder head

and the clamp must be positioned

with the head toward the firewall.

Position all the exhaust components

in their original positions, and begin to

tighten all exhaust clamps, beginning

with the v-band clamp and working

downstream.
Note: If a pyrometer is used, the

probe may be installed in the threaded

port, located in the side of the

Brake casting. Remove the plug and

install the probe using the anti-seize

provided.

15.

on trucks built in 1999 and later

(see note on page 4), install support

bracket using the supplied bolts. The

3

8

-16 x

3

4

” bolt is used on the brake

housing side of the support bracket.

The M10-1.5 x 20mm bolt is used on

the cylinder head side of the bracket.

See Figure 6.

Advertising