Banks Power Chevy_GMC Trucks: Duramax LMM (Diesel ’07 - 10 6.6L) Power Systems- PowerPack & Stinger w_EconoMind '07-10 (iQ) Compatible with Optional Banks iQ User Manual

Page 37

Advertising
background image

96818 v.2.0

37

Not needed if the optional Banks iQ is

installed.
CAUTION: Do not use force

when working on plastic parts.

Permanent damage to the part

may result.
Note: Before drilling, confirm that

there is adequate room for the Switch

and wires behind the dash. Make sure

wires or obstructions are cleared from

the drilling area.
From where the econoMind Switch will

be located, make sure there is enough

wire on the In-Cab Cable to reach the

Switch.

1.

The EconoMind Switch can be

installed on the driver’s side of the

instrument panel (IP) to the left side

of the steering column. There are two

dash types: Dash 1 (Figures 30, 31)

and Dash 2 (Figures 32, 33).

Note: these are just suggested

locations. It is possible to locate the

econoMind Switch where it is more

comfortable. Please confirm space

behind dash before drilling.

2.

To install on the driver’s side IP

(Dash 1, Figure 30):
Pull the IP trim out by pulling the top

edge above the vent as shown in

Figure 34. Disconnect any switch

wires.

3.

Cut out the supplied template,

Template 3, and align the dashed

lines to the edge of the IP where you

would like to mount the Switch. Tape

the template in place. Continue to

Step 7.

4.

To install the Switch to the left side

of the steering column (Dash 2 Figure

33):

Section 6

INSTALLATION OF THE (OPTIONAL) ECONOMIND SELECTOR SWITCH

Figure 30

Figure 31

Advertising