Banks Power Ford Trucks: (Diesel ’03 - 07 6.0L Power Stroke) Interface- Banks iQ "first generation Ford (03-10), Chevy (01-10), Dodge (03-07)" User Manual

Page 10

Advertising
background image

10

96831 v.6.0

1.

Locate the Window Mount Assembly

in your kit.

2.

Assemble the Banks iQ docking

station to the Universal mount by
inserting and sliding the Universal
mount tab into the docking station
groove. Hand tighten the nut behind
the docking station to hold the docking
station in place.

3.

Attach the window mount to your

Banks iQ. See Figure 3. Align and place
the two (2) lower tabs on the window
mount to the corresponding slots on the
bottom of the iQ first then snap the top
of the iQ into place.
NOTE: Due to the snug fit, use caution
when installing the Banks iQ into the
window mount.

4.

Find a suitable place on the

windshield for ease of access and

viewing of Banks iQ. Use location

shown in Figure 4 as a reference for
mounting Banks iQ in your vehicle.
Loosen the knob and move the swivel
suction plate to achieve desired viewing
angle of the Banks iQ screen. Do a test
fit and note the angle necessary to
achieve the correct viewing angle.

5.

Make sure the suction cup and the

mounting area on the windshield are
clean and dry. With the suction lever
in the up position, ensure the suction
cup is flat against the windshield, and
then push the suction lever down to
secure in place.
Connecting Banks iQ

6.

Locate the RJ12 cable (similar to

telephone connector) on your OBDII
interface cable or SpeedBrake wire
harness connected to the vehicle’s OBD
II connector. See Figure 5.

Section 3

MOUNTING aND CONNECTING THE BaNKS iQ

Figure 3 Attaching Banks iQ to window mount

Advertising