Grain Systems PNEG-1283 User Manual

Page 10

Advertising
background image

4. Installation

10

PNEG-1283 Moisture Sampler

12. Install Moisture Sampler discharge cover (D01-2305-8) in top two (2) holes drilled in the box end

using 5/16" bolt (S-6606).

(See Figure 4F.)

Figure 4F

13. Now install the Moisture Sampler over the two (2) bolts used to install the Moisture Sampler

discharge cover in

Step 12

and install remaining 5/16" bolt (S-6606) and nuts (S-3611) in the bottom

hole (do not tighten hardware yet). Attach the sensor end using 5/16" bolts (S-8135) and nuts
(S-3611) making sure that the heads of the bolts are on the inside of the discharge box tube. Now
tighten all seven (7) bolts attaching the Moisture Sampler.

14. Remove the four (4) bolts and lock nuts that hold the auger bearing and flangette the discharge box

bearing plate. Flip the auger bearing so that the outside is now the inside, then re-install bearing
flangette and hardware.

15. Before re-installing the discharge box slide the bearing lock collar onto the auger shaft with the

locking side of the collar facing the rear end of the auger shaft.

16. Now slide the discharge box/Moisture Sampler assembly over the auger and re-attach to the

discharge bearing plate on the dryer.

17. Engage the lock collar with the auger bearing and with a hammer and punch strike it in a clockwise

direction to set it with the bearing, then tighten set screw.

Moisture sampler discharge cover

Advertising