Heater installation, Transition hi-limit installation – Grain Systems PNEG-591 User Manual

Page 7

Advertising
background image

7

Series 2000 Downwind Heater

HEATER INSTALLATION

Air Pressure Switch and

Temperature Sensor Box

Installation

1. Using air switch box as a

guide, mark 2 holes on ple-

num side wall appproximately

24" to right of transition cen-

tered up and down in plenum.

2. Drill air switch filter hole 5/8"

diameter for snug fit. Drill tem-

perature sensor hole 5/8" or

larger to accommodate mounting

nut.

3. Mount Box to Bin using (4)

self drilling screws

4. Caulk between housing and side-

wall to seal.

Air Switch Box Assembly

1. Mark location on transition

one (1) foot up from the bot-

tom (entrance collar) and cen-

tered in the transition.

2. Drill or knock out 7/8" diam-

eter hole on marked location.

3. Install transition hi-limit using

supplied self drilling screws.

Transition Hi-limit Installation

Figure 1: The transition connecting the Series 2000 Heater to the bin with

the sensor in place.

Advertising